DHA Lahore House Construction Procedure (2025)
Constructing a house in DHA Lahore requires following DHA by-laws, approvals, and construction standards.
Step 1: Plot Ownership & Transfer
- Make sure the plot is in your name (ownership transferred via DHA Lahore transfer office).
- Clear all outstanding dues (development charges, transfer fees, etc.).
Step 2: Engage Professionals
- Hire a DHA-approved architect to design your house plan according to DHA building by-laws.
- Appoint a structural engineer for technical drawings (foundation, structure).
Step 3: Submission of House Map for Approval
- Submit the architectural drawings, structural drawings, and ownership documents to the DHA Building Control Branch.
- Documents Required:
- Ownership papers (Allotment/Transfer letter)
- CNIC copies
- Site plan
- Soil test report (for 1 Kanal & above)
- Paid challan of map approval fee
- DHA reviews & approves the plan (usually 2–4 weeks).
Step 4: Payment of Security & Approval Fees
- Map Approval Fee (depends on plot size).
- Security Fee: Refundable after completion (to ensure construction compliance).
Step 5: Start Construction
- Timeline: Construction must start within 1 year of map approval.
- Phases of Construction:
- Foundation & Structure: Excavation, foundation, grey structure.
- Roofing & Masonry: Slabs, walls, roof casting.
- Plumbing & Electrical: Concealed works.
- Finishing: Flooring, woodwork, paint, fittings.
Step 6: DHA Inspections
- DHA conducts regular inspections at different stages (foundation, lintel, roof, and finishing).
- Ensure construction matches approved drawings.
Step 7: Completion Certificate
- Once construction is complete, apply for a Completion Certificate.
- DHA inspects the site and issues the certificate (required for utility connections & resale).
Step 8: Utilities & Handover
- Apply for water, sewerage, gas & electricity connections through DHA/WAPDA/SNGPL.
- Pay possession & utility charges (if applicable).
Construction Timeframe
- 5 Marla House: 12–16 months
- 10 Marla House: 14–20 months
- 1 Kanal House: 18–24 months
- 2 Kanal & above: 24–30 months
Estimated Cost (2025)
(Approximate)
- 5 Marla: 1.5 – 2.5 Crore
- 10 Marla: 3 – 5 Crore
- 1 Kanal: 6 – 10 Crore
- 2 Kanal: 12 – 20 Crore+
(Cost varies by materials, design, and finishes.)
Pro Tip:
- Always hire DHA-approved architects & contractors.
- Avoid unauthorized extensions or deviations – DHA can impose fines or demolish violations.